Before beginning, some basic checklist items
All information regarding the control of your application
should be gathered from the ACH550 prior to selecting and
performing the actual replacement, control and parameter
settings should be noted to ensure consistency in the
replacement ACH580.
This checklist covers the main information you may require to
guide you through the replacement process. If the ACH550
cannot be powered, the technician should gather all the
information below that is not parameter related.
ABB 3BSC610023R0001 POWER SUPPLY SD812
ABB 3BHE032593R0001 Isolated Power Supply
ABB 3BHE021887R0101 UBCC717BE101 Board 3BHB002751R0102
ABB 3BHE024747R0101 GD C801 A 3BHE024748 P104
ABB XVC770BE101 3BHE021083R0101 Circuit Board
ABB 3BHE006412R0101 Circuit Board UFC762AE101
ABB 3BHB027232R0001 1-Phase Charging Transformer
ABB XZ C828 A101 Didt Dioder Snubber 3BHE039453R0101
Kollmorgen S60600 Servostar600 606-Fan 4 kVA, 6 A, 3 X 230 – 480 V
GE PCM Regulator for EX2100e Power Conversion Module 151X1235DB15SA1
BAUMULLER b maXX 3000 Servo Controller BM3401-LIFBO-ACOOOCB-G-02-O-02
LENZ EPL10200-W
EPZ-10203 CANPT010W3E
ICS Triplex T8270 Trusted 24 Vdc FanAssembly
Beckhoff Programmable Controller CEDIO 16/16-0.5
ABB 3BSE006503R1 PFSA140 PowerSupply Unit
ABB PFSC230 cable set 25m for DTU
SAACKE F-GDSA 143303 Controller SHIPS UPS
GE ENERGY HYDRAN H201Ci-1 One-Channel Controller