Before beginning, some basic checklist items

All information regarding the control of your application

should be gathered from the ACH550 prior to selecting and

performing the actual replacement, control and parameter

settings should be noted to ensure consistency in the

replacement ACH580.

This checklist covers the main information you may require to

guide you through the replacement process. If the ACH550

cannot be powered, the technician should gather all the

information below that is not parameter related.

ABB 3BSC610023R0001 POWER SUPPLY SD812

ABB 3BHE032593R0001 Isolated Power Supply

ABB 3BHE021887R0101 UBCC717BE101 Board  3BHB002751R0102

ABB 3BHE024747R0101 GD C801 A 3BHE024748 P104

ABB XVC770BE101 3BHE021083R0101 Circuit Board

ABB 3BHE006412R0101 Circuit Board UFC762AE101

ABB 3BHB027232R0001 1-Phase Charging Transformer

ABB XZ C828 A101 Didt Dioder Snubber 3BHE039453R0101

Kollmorgen S60600 Servostar600 606-Fan 4 kVA, 6 A, 3 X 230 –  480 V

GE PCM Regulator for EX2100e Power Conversion Module 151X1235DB15SA1

BAUMULLER b maXX 3000 Servo Controller BM3401-LIFBO-ACOOOCB-G-02-O-02

LENZ  EPL10200-W

EPZ-10203 CANPT010W3E

ICS Triplex T8270 Trusted 24 Vdc FanAssembly

Beckhoff Programmable Controller CEDIO 16/16-0.5

ABB 3BSE006503R1  PFSA140 PowerSupply Unit

ABB PFSC230 cable set 25m for DTU

SAACKE F-GDSA 143303 Controller SHIPS UPS

GE ENERGY HYDRAN H201Ci-1 One-Channel Controller