Installation

It is the responsibility of the OEM, system integrator,

or end user to properly install the PLC equipment for

safe and reliable operation.  Product manuals provide

detailed information about installation, startup, and

proper use of the PLC equipment.  The installation

manual, shipped with your PLC programming

software, describes how to properly install the equipment.

If the PLC installation must comply with supported

standards, such as FCC or CE Directives, please refer

to the Installation Requirements for Conformance to

Standards, shipped with the PLC programming

software, for additional guidelines.

Installation should not be attempted without refer

ring to the applicable Programmable Controller Installation Manual.

Connect the battery to either of the battery connec

tors on the module (see Figure 2).

Put the toggle switch in the STOP position.

Put the keyswitch in the Memory Protection OFF position.

Make sure that rack power is off.

Install the CPX 928 module in slot 1 of rack 0 (see Figure 1).

Turn on power