Installation
It is the responsibility of the OEM, system integrator,
or end user to properly install the PLC equipment for
safe and reliable operation. Product manuals provide
detailed information about installation, startup, and
proper use of the PLC equipment. The installation
manual, shipped with your PLC programming
software, describes how to properly install the equipment.
If the PLC installation must comply with supported
standards, such as FCC or CE Directives, please refer
to the Installation Requirements for Conformance to
Standards, shipped with the PLC programming
software, for additional guidelines.
Installation should not be attempted without refer
ring to the applicable Programmable Controller Installation Manual.
Connect the battery to either of the battery connec
tors on the module (see Figure 2).
Put the toggle switch in the STOP position.
Put the keyswitch in the Memory Protection OFF position.
Make sure that rack power is off.
Install the CPX 928 module in slot 1 of rack 0 (see Figure 1).
Turn on power
Leave a comment
Your email address will not be published. Required fields are marked *