Events that can cause a switchover include:
Hardware failure within the active card.
Communications failure between the active card
and the controller.
Detection of a fault in the field wiring.
A switchover may also be initiated from the diagnostics explorer, and the health and status of both cards and their channels are
available in the diagnostics explorer.
The system automatically commissions a new standby card. In safe areas, failed cards can be replaced under power.
In hazardous areas, appropriate installation procedures must be followed.
Switchover of a redundant I/O card is completed within
two scans of the I/O bus. Make-before-break contacts ensure
digital field instruments remain powered and the process
is undisturbed. Analog output signals are briefly driven by
both cards for <5 ms during switchover of the card.
Hardware alerts automatically report hardware integrity errors
for both the primary and secondary cards. Any event that
causes a switchover is also reported automatically through the
system hardware alerts and is logged in the Event Chronicle.
Leave a comment
Your email address will not be published. Required fields are marked *